Tower Crane Erection Process

Date:2014-2-28

Cast a concrete base for the basic mast of the crane with timber formwork Assemble the telescopic cage section on top of basic mast Assemble the top mast section just under the mast cabin on top of cage section Erect the section of top tower containing the mast cabin above top mast section Fix the counter-jib perpendicular to the vertical tower using the counter-jib tie Hang the counterweights at the end of the counter-jib Install the main jib with the main jib tie Hang the jib trolley on the main jib After erecting the whole tower crane, it was ready for "raising" to the required operating height. This was achieved by jacking up hydraulically the telescopic cage section and then bringing extra standard mast sections into the telescopic cage consecutively until sufficient height was reached.

TypeInfo: Industry News

Keywords for the information:

Shandong Huaxia Group Co., Ltd.
Company Address: Huaxia Road, Weihai, Shandong Province
Export Phone:0631-5982999
c)

Hotline Fax:

0086-0631-5987519(Domestic) 

0086-0631-5999076(Abroad)
Accessories Sales:

0086-0631-5999018
Anti-fake Supervision :

0086-0631-5993999
Zip Code:264205
Corporate Mailbox:huaxia12007@163.com

 
content:
* Entered characters:0 Word
小于等于500字符
mailbox:
*
phone:
*
code:
*
   

0

Shandong Huaxia Group Co., LTDAll rights reserved        powered by www.300.cn            鲁ICP备10005875号     [Backstage management]